A TEC Plant Construction

From smaller conversions to large-scale projects: A TEC Plant Construction provides innovative solutions when it comes to steel constructions. Thanks to our long-standing experience in the cement and raw materials industries, we are able to reduce energy costs, meet environmental requirements and increase plant efficiency with our products and components.

 

 

Splash Box

Splash Box

For Most Efficient Meal Distribution:

  • Optimized meal distribution
  • Optimized heat exchange
  • No increase of pressure drop in riser duct
  • Utilization of up to 80% of riser duct cross section

Optimized distribution of the feed into the riser ducts of cement kilns is a key factor for optimized heat exchange and thermal efficiency of the pyroprocess. The engineering team of A TEC has designed a special SPLASH BOX to avoid a poor degree of calcination of the raw material, high exit temperature at the preheater top stage and consequently higher specific energy consumption (kcal/ kg clinker) as well as poor clinker quality.

This specially designed splash box has a wide opening and a specifically vaulted dispersion plate inside the splash box to ensure homogenous dispersion of the meal across the entire cross section of the riser duct, thus avoiding a pressure drop normally caused by conventional dispersion plates.  A TEC’s Splash Box is easy to install, maintenance-free and durable.

Advantages:

  • Optimized Meal Distribution
  • No Increase of Pressure Drop of Riser Duct
  • Easy Installation
  • Long Lifetime
  • No Maintenance, respectively no adjustment work necessary
  • no dispersion plate inside the cross section of the riser duct